Run your projects in the same place your engineering data lives

Thoma includes a full PLM-grade project management subsystem — not a bolt-on, not a separate login. Schedule, budget, risk, gate reviews, lessons, and earned-value reporting, all linked back to the products + documents + changes the projects are actually delivering.

Nine views, one project

Different stakeholders want different cuts of the same data. Switch views with one click; the underlying schedule + tasks + risk register stay live.

Schedule

Indented task hierarchy with predecessors, durations, and effort-on-finish dates. Edit a task on the schedule and the dependent dates roll forward automatically.

Gantt

Drag-to-resize bars, dependency arrows, critical-path highlighting, baseline overlay so you can see slip against the original plan at a glance.

Timeline

Compact swim-lane view grouped by assignee, milestone, or workstream. Useful for the executive read-out where the gantt is too much detail.

Calendar

Month grid showing tasks + milestones by due date with status filters. The view ops people actually want when triaging today's work.

Budget

Per-project budget with planned vs actual roll-up across labor + capital + materials. Variance tracking to date and at-completion.

ROI

Multi-year financial projections (revenue, cost, margin, NPV, payback period). Locked once a baseline is committed so your business case doesn't drift.

Reports

Schedule variance, earned-value (CPI/SPI), per-user task performance, status summaries — exportable. Built for the steering-committee deck.

Lessons

Capture what worked + what didn't at gate reviews and post-launch retrospectives. Searchable across projects so the next team doesn't repeat the same misstep.

Health

Top-of-screen health dashboard: schedule, budget, scope, risks, dependencies. RAG-flagged so anyone glancing at the project sees status in 2 seconds.

Stage-gate by default

Most engineering shops already run some flavor of stage-gate — APQP, NPI, your own custom phases. Thoma codifies it. Templates define your phases + gates + entrance and exit criteria + required deliverables. Every project from the template inherits the structure; deviations are recorded and explainable.

Baselines snapshot the plan at each gate so variance against the original commitment is visible at-a-glance, not buried in a spreadsheet someone forgot to update.

# Example template: New Product Introduction
Phase 1 — Concept
Gate 0: Charter approved → enter Design
Phase 2 — Design
Gate 1: Design review passed → enter Verification
Phase 3 — Verification
Gate 2: V&V complete → enter Launch
Phase 4 — Launch
Gate 3: Production-ready → close project
# Each gate: deliverables checklist, approver routing,
# pass/fail decision, structured review record

What's in the box

Project templates

Define your stage-gate process once (NPI, ECO, sustaining engineering, custom builds — whatever your shop runs). Spin up a new project from the template in 30 seconds. Templates carry default tasks, durations, dependencies, gate reviews, and required deliverables.

Baselines

Snapshot the schedule + budget + scope at any point — typically at each gate. Baselines are immutable. The active plan can drift; baselines stay frozen so you can measure variance against an authoritative plan-of-record.

Gate reviews

Configurable gates between phases (Concept → Design → Verification → Launch, or your own naming). Each gate carries entrance + exit criteria, required deliverables, approver routing, and a structured review record. Gate fail returns the project to the prior phase.

Tasks + assignments

Tasks belong to a project + a workstream + an assignee. Predecessors, dependencies, effort estimates, actuals on completion. Per-user task list at the top of every Thoma session — no more 'what am I supposed to be working on this week?'.

Risk register + heat map

Track risks per project with probability × impact heat-mapping, owner, mitigation status. Risks roll up to portfolio-level dashboards. Risk filters apply across the schedule view to highlight tasks under threatened risks.

Linked artifacts

Attach documents, BOMs, change requests, and decisions to tasks + gates. The deliverables checklist on a gate review is a living list — tick the box only when the linked artifact is in approved status.

MS Project export

One-click export to MS Project XML for stakeholders who insist on opening files in Microsoft Project. Round-trip back into Thoma is on the roadmap.

Per-user accountability

Reports show task delay attribution by assignee — useful for retrospectives and capacity planning, not for blame. Combined with the audit log surface, every project decision has a name + timestamp on it.

Linked, not siloed

Project tasks reference documents, BOMs, change requests, and decisions in the same vault. Closing a gate doesn’t require chasing five different systems for proof the deliverables exist.

Permission-aware

Per-tab permissions: not everyone should see ROI projections or budget actuals. The schedule + tasks are open to the team; financials are gated to whoever needs them.

Auditable

Every gate decision, baseline, status change, and budget revision lands in the audit log with actor + timestamp. CMMC + ISO auditors love this; you don’t have to assemble it after the fact.

Ready to look at it?

The live demo includes a fully populated NPI project with baselines, gate reviews, and earned-value reports.